Pier cap-area excavated to allow for pier to be drilled under grade beam
Drilled pier before steel and concrete
Drilled pier after concrete and steel
Drilled piers under fireplace
Schedule 40 steel pipe with steel plates for shimming and fine tuning. Using this system allows for the piers to be adjustable
Hydraulic jacks are used to mechanically lift the foundation